One of our pharmaceutical industry owners from Vadodara wanted to install solar. He has an average consumption of electrical energy of 33,300 kWh per month. This costs him approx 2.5 lakh per month. In addition to this, he noticed a continuous increment in energy charges every year. So finally, in June 2019 they decided to install solar panels on his pharma factory. We have faced various challenges while designing and installing 126KW Solar Power Plant. We visit the site and design this project with accurate measurements and location. While designing, we do shadow analysis and structural design. Then we come to know that this project holds 126KW Solar Power Plant.

We designed a complete 3D model of the site and simulate complete project in software. Finally, the project got installed as per the drawings and commissioned recently. Our team inspected the site and checked the electrical parameters. The plant is working as expected and hopefully, ROI will be done before 3.75 years. This project helped us to build stronger business relations with our client EPC company. To Know More.

126KW Solar Power Plant
126KW Solar Power Plant